Agenda Item: |
Agenda 1.13 |
Resolution(s): |
Resolution [COM6/13] |
Description of work: |
To consider the results of ITU-R studies in accordance with Resolution [COM6/13] (WRC-07) and decide the spectrum usage of the 21.4 - 22 GHz band for the broadcasting-satellite service and the associated feeder-link bands in Regions 1 and 3 |
Lead Working Party(s): |
WP 4A |
Involved Working Parties: |
WP 3M, WP 4B, WP 5A, WP 5C, WP 6D, WP 6G, WP 7D |
How Visualyse products can help: |
Visualyse Professional Version 7 can be used to study compatibility between BSS and FSS including feeder links and other services such as fixed and mobile. Our Visualyse GSO tool can be used to analyse sharing between GSO networks |
How Transfinite consultants can help: |
We have a good understanding of the existing regulatory procedures and can use this to analyse and propose planning methodologies, coordination procedures etc to facilitate its use by BSS and their feeder links |
|
|
Previous |
Next |