WRC 2003 Agenda Item Details
Agenda Item: | [Resolution 79] |
Resolution(s): | Resolution 79 (COM 5-27) |
Description of work: | Study the technical basis of coordination between RA stations operating in the 42.5 - 43.5 GHz band with HD-FS stations |
Lead Study Group:: | SG 7 |
Working Parties: | WP 7E, WP 9D |
How Visualyse products can help: | Visualyse can model in detail HDFS systems in these bands including BFWA services (P-MP both base and user terminal plus mesh architectures). Visualyse can calculate interference and PFD including aspects such as shielding, propagation over terrain using Rec. 452 and the aggregate effect of thousands of cells and millions of user terminals. |
Previous | Next |